Technology inside the building-
The labyrinth of lines, pipes, and wires
Every building features separate systems to provide energy, light, heat, cooling, communications, and fire protection. Dense networks of cables, pipes, wires and lines permeate the buildings and require an integrated planning approach. In this way we can recognize and avoid potential conflicts between these different systems at an early stage. It is our responsibility to establish the correct requirements for each project in close cooperation with the client and the relevant authorities. Whether it is the redundancy of safety systems, multi-level fire protection systems, or the use of renewable sources of energy, the most efficient solution is always our goal.
|
|
|
|
Isolated ventilation circuits for the supply of fresh air in offices that are being regulated and adjusted to the outside temperature. Individual regulation of every office. Therefore no noise due to open windows.
|
The planning of building systems is generally underestimated. One only thinks of the usual supply lines for water, sewage, heating, power and telephone. But over the last decade so much has changed in the building equipment sector for residential premises, business and storage accommodations that many constructors are totally surprised by the new technology and its possibilities for cost savings. Especially the introduction of the power savings regulation has far reaching consequences for modern constructions. It is our job to judge this correctly for you.
|
|
 |
 |
|
Heat regulation of a 1.6 MW heating facility by gas-powered double boilers
|
Sprinkler center being mounted for 1000 cbm of fire-extinguishing water with 2 diesel pumps
|
 |
 |
|
Heat pump with 270 kW (in the front), powered by one engine in the back (for the use in a hospital).
|
One of three transformers (3 MW) for the transformation of a medium voltage of 11.000 volts to 400 volts of lower voltage.
|
|
|
|
|
|
Interessiert Sie eine der abgebildeten Anlagen? Haben Sie ein aktuelles Planungsproblem im Bereich der technischen Gebäudeausstattung? Wir helfen Ihnen gern. In über 20 Jahren Planungsleistung haben wir Ihr Problem vielleicht anderenorts bearbeitet und können Ihnen mit dieser Erfahrung helfen! Tel.: +49 (0)40 8662070
|
|
|
|